Short Guide for Pedestals Measurement


  1. stop data acquisition, close tape
  2. close injection beamline ('FB5', ask COSY operator)
  3. disable trigger (OR-unit, all switches to OFF)
  4. Wendy Master Control Window:
    1. ->'Start Control Proc' ->'FB LeCroy Sys.'
    2. ->'Start Control Proc' ->'CAMAC Drams Sys.'
  5. two windows have appeared:
  6. in 'CAMAC Drams ...'
    1. at beginning of flat-top
      ->'Setup' ->'Build Pedestals'
    2. wait for message 'Pedestals build, ...' appearing in 'COSY Log' window
    3. ->'Setup' ->'Load Setup'
    4. to check pedestal values:
      ->'Monitoring' ->'Show Setup Par.'
    5. ->'General' ->'Save Setup'
  7. in 'FASTBUS ...'
    1. check the number of events requested:
      ->'Setup' ->'ADC 1881 Setup' ->'Build Pedestal Setup'
      must be below 'flattop (in sec) × 10'
    2. at beginning of flat-top
      ->'Setup' ->'ADC 1881 Setup' ->Build Pedestals'
    3. wait for message 'Pedestals build, ...' appearing in 'COSY Log' window
    4. ->'Setup' ->'Load Setup'
    5. to check pedestal values:
      ->'Monitoring' ->'show module setup' ->'ADC 1881 setup' ->'Thresholds'
    6. ->'General' ->'Save Setup'
  8. enabble trigger (OR-unit)
  9. enable beam injection (FB5)
  10. open tape, start data acquisition